Sonco Construction

Contact: (909) 260-4749 or (909) 223-1280


Licenses: CA: 911666 AZ: ROC 318345 OR: 216243


Projects

Projects

Modesto WWTP Phase 2 BNR/Tertiary Wastewater Treatment Project General Contractor: GSE Construction – Carollo Engineering Design Scope: Installation and Welding of Ameron T-Lock (~12000 sqft)


SARI Mainline Relocation, Yorba Linda Ca. General Contractor: RASIC Construction. Welding and Application of Ameron protective lining – Manholes and Structures


Terminal Island WWTP, San Pedro Ca. General Contractor: Colich & Sons. Scope: Rehabilitate concrete and install Ameron Arrow Lock


SROG SAI & MANHOLE REHABILITATION PHX AZ. General Contractor: B&F Contracting – Dibble Engineering Scope: Pipeline joint and manhole rehab


Manhole Rehabilitation, Colton, Ca. Agency: Santa Ana Watershed Project Authority (SAWPA) Scope: Rehabilitation of existing manholes


Joint Outfall Unit D, Los Angeles Ca. General Contractor: Mladen Buntich Construction Company, Inc. Scope: Rehabilitation of pipeline and repair of Linabond


San Leandro WWTP, San Leandro, Ca. General Contractor: Amoroso Construction – Carollo Engineering Design Scope: T-Lock welding structures and manholes


Joint Outfall “C” Relief Trunk Sewer Phase 1, Los Angeles Ca. General Contractor: W.A. Rasic Construction Scope: Installation and Welding of PVC Lining at Junction Structures and approximately 6,000 lineal feet of 90” PVC lined RCP