Modesto WWTP Phase 2 BNR/Tertiary Wastewater Treatment Project General Contractor: GSE Construction – Carollo Engineering Design Scope: Installation and Welding of Ameron T-Lock (~12000 sqft)
SARI Mainline Relocation, Yorba Linda Ca. General Contractor: RASIC Construction. Welding and Application of Ameron protective lining – Manholes and Structures
Terminal Island WWTP, San Pedro Ca. General Contractor: Colich & Sons. Scope: Rehabilitate concrete and install Ameron Arrow Lock
SROG SAI & MANHOLE REHABILITATION PHX AZ. General Contractor: B&F Contracting – Dibble Engineering Scope: Pipeline joint and manhole rehab
Manhole Rehabilitation, Colton, Ca. Agency: Santa Ana Watershed Project Authority (SAWPA) Scope: Rehabilitation of existing manholes
Joint Outfall Unit D, Los Angeles Ca. General Contractor: Mladen Buntich Construction Company, Inc. Scope: Rehabilitation of pipeline and repair of Linabond
San Leandro WWTP, San Leandro, Ca. General Contractor: Amoroso Construction – Carollo Engineering Design Scope: T-Lock welding structures and manholes
Joint Outfall “C” Relief Trunk Sewer Phase 1, Los Angeles Ca. General Contractor: W.A. Rasic Construction Scope: Installation and Welding of PVC Lining at Junction Structures and approximately 6,000 lineal feet of 90” PVC lined RCP
For More Information or to Request a Quote Call (909) 260-4749 or (909) 223-1280
ADDRESS
4927 Toronto Ave, Fontana Ca 92336
California, Arizona, Oregon
B - General Building
C - 8 Concrete
Ameron T-Lock Welding
Ameron Arrow Lock Application
Linabond Application
Confined Space Entry
SIKA factory trained
Richard Chico started in 1992 by installing and welding protective lining systems. In 2000 Richard became the sole owner of RMC Construction performing all types of concrete construction and protective lining projects.
Ameron T-lock lining
Ameron t-lock certification
Ameron t-lock liner installation
Protective lining (t-lock)
Protective liner systems
T-lock welding
PVC Lining